Start here
What moved vs the prior 30 days — start with signals, then metric deltas and trends.
Questions this page answers
6 metrics regressed vs the prior period — review signals first.
Tracking 6 delivery metrics · 6 regressed
Automated highlights from delivery, quality, and attention data
11 PRs need attention
Long-living or review-hanging PRs are slowing delivery. Open the Attention inbox.
3 recent deploy failure(s)
Latest: WatchTowerHD.hdwatch_frontend · dev.
14 PRs in flight
High WIP can fragment focus and increase context switching.
Ranked by merged pull requests in this window
Follow-up pages that deepen the story for this view
Biggest movers vs the prior window of equal length
201.5h
Prior period: 131.5h
44.5h
Prior period: 20.9h
99.6h
Prior period: 74.6h
1.2
Prior period: 2.3
36
Prior period: 68
40
Prior period: 77
Period-over-period change for key delivery signals